Book a consultation

Straight answers

How long does it take to build a tiny home?

10 to 12 weeks from design approval, with photo updates from the shop floor every week. Current slot availability is confirmed on your consultation call.

01 — The longer answer

Where the time goes: permits versus the factory

For garden suites and other modular projects, permitting is usually the longest step and varies by municipality. The factory build runs in parallel with your site preparation, and once the foundation is ready the home is delivered, set, and connected in days, not the months a stick-built backyard project spends on-site.

Payment follows the build: five milestone payments, each requested only after the work is photographed and shared with you, with the final 5% due after you walk through your finished home.

02 — Where to go next

Follow this journal

Add KYRAX as a preferred source in Google and our guides show up higher in your own search results, marked as preferred where Google cites us. It changes what you see, not what anyone else does.

Have a lot in mind?

We check your destination before you sign anything. 30 minutes, no obligation.