The Journey to Your Doorstep
After months of anticipation, the moment arrives: your tiny home is ready for delivery. Understanding this process helps you prepare properly and avoid common pitfalls.
Pre-Delivery Preparation
Site Assessment (4-6 weeks before delivery)
- Access Evaluation: Can delivery trucks navigate your route? Consider road width, overhead clearances, and turning radius.
- Ground Conditions: Is the ground level and stable enough to support the home?
- Utility Locations: Mark all underground utilities before any ground work.
Site Preparation (2-4 weeks before delivery)
For Foundation Models:
- Excavation and grading
- Foundation installation (pier, slab, or crawl space)
- Utility rough-ins (water, sewer, electric)
- Allow concrete to cure (typically 7-14 days)
For Trailer Models:
- Level gravel pad or paving stones
- Wheel chocks and stabilization points
- Utility connection points accessible
Delivery Day
Timeline
Most deliveries are scheduled early morning to allow full day for setup.
What to Expect
- Arrival: Pilot car (if required) followed by transport vehicle
- Positioning: Careful maneuvering to final location
- Leveling: Precision adjustments for proper drainage and door function
- Securing: Anchoring to foundation or trailer stabilization
- Initial Inspection: Walk-through with delivery team
Your Responsibilities
- Ensure clear access path
- Have site preparation complete
- Be present or have representative available
- Have payment ready per contract terms
Post-Delivery Setup
Utility Connections (1-3 days)
- Licensed electrician for power connection
- Plumber for water and sewer hookups
- HVAC technician for system startup and testing
- Internet/cable installation if applicable
Final Touches
- Skirting installation (for trailer models)
- Deck or porch attachment
- Landscaping around home
- Address and mailbox setup
Common Challenges and Solutions
Challenge: Access road too narrow
Solution: Pre-measure with delivery team; consider temporary road widening or crane placement
Challenge: Site not level
Solution: Additional fill and grading; extended foundation work
Challenge: Utility delays
Solution: Schedule utility work before delivery date; have backup heating/cooling
Challenge: Weather delays
Solution: Build buffer time into your move timeline
KYRAX Delivery Promise
We coordinate the entire delivery process:
- Pre-delivery site consultation
- Professional transport with experienced operators
- On-site setup and leveling
- Systems testing before handoff
- Detailed walkthrough of all features
- 48-hour follow-up call to address questions
Typical delivery radius: 500 miles from manufacturing facility. Extended delivery available with additional transport fees.
Ready to start? Browse our ready-to-deliver tiny home models β each one ships from our facility with full site setup included.